Explore practical procurement case studies designed for beginner, intermediate, and advanced professionals. These real-world scenarios challenge your thinking on supplier selection, sourcing strategy, cost management, and risk mitigation. Test your procurement knowledge and strengthen your decision-making skills through interactive questions and discussions.
Advanced Real-World
Procurement Scenarios
Three in-depth case studies across Beginner, Moderate, and Advanced levels — designed to challenge your strategic thinking, sharpen your decision-making, and prepare you for real procurement leadership.
Sunrise Consumer Products Ltd. is a mid-sized FMCG company based in Dhaka, Bangladesh, producing personal care and household cleaning products. The company exports to 12 countries and operates two production facilities with a combined monthly output of 4,000 metric tons.
The procurement department is headed by a Procurement Manager supported by two junior executives. The company does not currently have a formal Approved Vendor List (AVL) system — vendors are added informally when needed, often based on referrals from colleagues or management.
In March 2025, the Marketing department launched a new product — a premium skin cream in a distinctively shaped glass jar with a custom aluminium lid. The packaging was critical to the brand's premium positioning and had specific tolerances for lid thread diameter, glass thickness, and surface finish.
The production team submitted a Purchase Requisition for 50,000 units of the new packaging, needed within 21 days to meet the planned product launch date. Feeling the urgency, the junior procurement executive contacted a packaging supplier — Green Pack Industries — who had been recommended by a colleague. Green Pack had never supplied to Sunrise before and was not registered in the company system.
Without conducting a vendor evaluation, requesting a factory profile, obtaining quality samples, or running a credit check, the executive issued a Purchase Order worth BDT 18,00,000 directly to Green Pack Industries. A 50% advance payment was made before production.
- Day 1–3: PO issued and advance payment transferred. No written contract signed. No specification sheet shared with supplier.
- Day 8: Green Pack confirms production has started. No sample submitted for approval.
- Day 18: Delivery arrives — 3 days late. QC team inspects the shipment.
- Day 19: QC rejects 35% of the units — lid thread diameter does not match the jar spec, causing seal failure. Surface finish on 8,000 jars is substandard for the premium positioning.
- Day 20: Production line halted. Marketing delays product launch by 4 weeks. Customer pre-orders cannot be fulfilled.
- Day 21: Green Pack refuses to replace rejected units claiming the specification was never provided to them in writing. Legal department is engaged.
- Day 30: Sunrise must source emergency replacement packaging from an alternative supplier at 22% higher cost and air freight the items — adding BDT 4,20,000 to the total procurement cost.
-
1What were the three most critical procurement errors made in this case? Explain why each error was avoidable. Process
-
2Design a vendor registration checklist that Sunrise should implement for all new packaging suppliers. What minimum documents should be collected? Strategy
-
3Should the procurement executive have escalated the urgency of the request to their manager rather than bypassing process? What internal communication should have occurred? Ethics
-
4How could Sunrise have protected itself legally and financially even if they needed to use an unregistered vendor due to urgency? Finance
-
5Calculate the Total Cost Impact of this procurement failure. Consider: advance payment risk, emergency sourcing premium, air freight, production downtime, and brand impact. Analysis
-
6Propose a Standard Operating Procedure (SOP) for new vendor onboarding that would have prevented this situation from occurring. Process
Medicore Pharmaceuticals Ltd. operates a WHO-GMP certified production facility in Gazipur, Bangladesh. The plant runs 24/7 across three shifts producing injectable medicines. Equipment reliability is non-negotiable — any unplanned breakdown in the filling or sterilization lines triggers a regulatory reporting obligation and can result in product destruction if sterility is compromised.
The company maintains Annual Maintenance Contracts with several specialized contractors. The most critical is with TechServ Engineering Co., who hold the AMC for the Automated Filling Line (AFL-7) — the company's highest-output production line contributing 38% of monthly revenue.
The current 3-year AMC with TechServ is expiring in 60 days. Procurement is tasked with renewing or replacing it. The existing contract is valued at BDT 42,00,000 per year and covers preventive maintenance (12 visits/year), emergency response (4-hour SLA), OEM spare parts supply, and annual calibration certification.
TechServ has submitted their renewal proposal with a 28% price increase — citing inflation in spare parts costs, technician wage increases, and higher logistics costs. They also want to revise the emergency response SLA from 4 hours to 8 hours.
Procurement has identified two alternative contractors: Delta Maintenance Services and ProMech Bangladesh. However, neither has previously worked on AFL-7 equipment (German-manufactured, proprietary systems). Switching would require a technology transfer period of 8–12 weeks during which service quality risk would be elevated.
| Parameter | TechServ (Current) | Delta Maintenance | ProMech Bangladesh |
|---|---|---|---|
| Annual AMC Price | BDT 53,76,000 (+28%) | BDT 38,00,000 | BDT 41,00,000 |
| AFL-7 Experience | 5 Years — OEM Trained | None | None |
| Emergency SLA Offered | 8 Hours (revised) | 6 Hours | 8 Hours |
| Preventive Maintenance Visits | 12/year | 10/year | 12/year |
| OEM Spare Parts Access | Direct OEM Partnership | 3rd Party / Aftermarket | Mixed (OEM + 3rd Party) |
| ISO Certification | ISO 9001 : 2015 | ISO 9001 : 2015 | In progress |
| Technology Transfer Period | None Required | 10–12 Weeks | 8–10 Weeks |
| Historical Uptime Achievement | 98.4% | Unknown | Unknown |
-
1Should Procurement accept TechServ's renewal proposal, reject it and switch, or negotiate? Build a structured recommendation with financial justification. Strategy
-
2Calculate the True Total Cost of Ownership for each option — TechServ (at +28%), Delta, and ProMech. Factor in downtime risk, SLA differences, and technology transfer cost. Analysis
-
3Prepare a negotiation strategy against TechServ's 28% increase. What concessions would you demand in return? What are your walkaway conditions? Negotiation
-
4How would you handle the SLA revision from 4 hours to 8 hours — is this acceptable given the revenue at risk? Draft a counter-proposal on the SLA clause. Finance
-
5What procurement strategy should Medicore adopt over the next 3 years to reduce dependency on a single specialized AMC provider? Risk
-
6Design a Supplier Performance Scorecard specifically for AMC providers in a GMP-regulated facility. What KPIs would you track and how would they influence future contract decisions? Process
Atlas Textile Group is one of Bangladesh's largest vertically integrated garment and fabric manufacturers, employing 18,000 people across six facilities. The Group's expansion plan for FY2025–26 includes a BDT 85 crore capital investment to install a new high-speed rapier weaving unit at their Narsingdi facility — targeting export-grade technical fabrics for European markets.
The Procurement Director oversees a 12-person team handling both local and import procurement. The CAPEX procurement for this expansion — covering 32 rapier weaving machines, 4 warping machines, 2 sizing machines, and all ancillary equipment — has been delegated to the Senior Procurement Manager, Mr. Rafiqul Islam, with board-level oversight.
Phase 1 — Supplier Selection (Month 1–3): After a global tender process, three suppliers were shortlisted from Germany (Lindauer DORNIER), China (Picanol Asia), and Italy (Itema Group). Following technical evaluation, site visits, and commercial negotiation, the board approved awarding the contract to Picanol Asia — who offered the best price-performance ratio at USD 4.2 million, with a committed delivery timeline of 8 months after advance payment.
Phase 2 — Contract & Payment (Month 4): A Letter of Credit (LC) was opened for 30% advance (USD 1.26M), with 40% against Bill of Lading and 30% on commissioning. The contract included a delivery milestone clause and a 1.5% per week liquidated damages (LD) clause for delays beyond the agreed delivery date, capped at 10% of contract value.
Phase 3 — Mid-Project Crisis (Month 7): Picanol Asia informs Atlas that production of the weaving machines is delayed by 12–14 weeks due to a shortage of electronic control modules (a post-COVID semiconductor supply issue). They invoke a Force Majeure clause in the contract, claiming the delay is beyond their control.
Phase 4 — Compounding Problems (Month 8–9): The Bangladeshi central bank announces a new import regulatory requirement — all textile machinery imports above USD 1 million now require a pre-import inspection certificate from a Bangladesh Bank-approved agency. This was not anticipated at the time of LC opening. The C&F agent warns that customs clearance could be delayed by an additional 6–8 weeks unless the inspection certificate is obtained from China before shipment.
Phase 5 — Financial Pressure (Month 9): The USD/BDT exchange rate has depreciated significantly. At the time of LC opening, 1 USD = BDT 110. The current rate is 1 USD = BDT 122 — adding approximately BDT 5.04 crore to the landed cost beyond the approved budget. Finance is demanding Procurement justify the variance.
Phase 6 — The Board Question (Month 10): The Board of Directors is informed of the cumulative situation: 14-week delay, budget overrun, disputed Force Majeure claim, new regulatory compliance requirement, and the Narsingdi facility sits idle with 400 hired workers awaiting the machines. They ask Procurement to present a comprehensive recovery plan with options.
- Month 1–3: Global tender, technical evaluation, site visits. Contract awarded to Picanol Asia — USD 4.2M. LC opened for 30% advance.
- Month 4–6: Production reportedly on schedule. Periodic progress reports received but no on-site inspection conducted.
- Month 7: Force Majeure notice received from Picanol — 12–14 week delay declared due to semiconductor shortage.
- Month 8: Bangladesh Bank new import regulation announced. C&F agent flags pre-import inspection requirement — not anticipated. LDs begin accruing but Picanol contests applicability due to FM claim.
- Month 9: USD/BDT rate moves to 122. Budget overrun of BDT 5.04 crore crystallizes. Narsingdi plant sits idle — 400 workers on payroll with no production.
- Month 10: Board demands a recovery plan with legal, commercial, and operational options clearly laid out.
| Item | Original Plan | Current Status | Variance |
|---|---|---|---|
| Total Contract Value | USD 4.2M (BDT 46.2 Cr @ 110) | BDT 51.24 Cr (@ 122) | +BDT 5.04 Cr |
| Delivery Timeline | 8 Months | Projected 22 Months | +14 Weeks delay |
| LD Accrual (10% cap) | Not anticipated | USD 420,000 (if enforceable) | Potential recovery |
| Idle Labour Cost | Zero (not planned) | ~BDT 60L/month (400 workers) | Escalating monthly |
| Inspection Certificate | Not required (at contract time) | Now mandatory pre-shipment | 6–8 week processing risk |
| Revenue Lost (Narsingdi) | Zero | ~USD 280,000/month | Critical |
-
1Critically evaluate Picanol's Force Majeure claim. Is it legally valid? What documentary evidence should Atlas demand, and should Atlas contest the LD waiver? Build your legal-commercial argument. RiskLegal
-
2Calculate the full financial impact of this CAPEX procurement crisis — including: currency overrun, idle labour cost (projected to delivery), LD recovery potential, and monthly opportunity cost loss. Present as a structured financial brief. AnalysisFinance
-
3How should Procurement handle the new Bangladesh Bank pre-import inspection requirement? Who are the stakeholders to engage, what is the process, and how do you minimize further delay? Process
-
4What foreign exchange risk management strategy should have been implemented at the time of LC opening, and how should the BDT 5.04 crore budget variance be presented and justified to the Board? FinanceStrategy
-
5Develop a structured Board Recovery Presentation — covering three options: (a) continue with Picanol with revised commercial terms, (b) partial termination and dual sourcing with a secondary supplier for remaining equipment, (c) full termination and re-tendering. Evaluate each option's risk, cost, and timeline. Strategy
-
6What procurement governance failures enabled this crisis? Design a CAPEX Procurement Governance Framework for Atlas — covering contract structure, milestone monitoring, forex management, regulatory scanning, and supplier on-site progress verification. Governance